UP 6196 (Former SP 133 built in 1995) and UP 5703 a 2001 built GE C44ACCTE act as distributed power units on the back of the Valmy,Nevada-Skyline Mine,Utah coal empties. The heavy spring rains of the past few months have made the hillsides above Provo and the rest of Wasatch Front extra green. |